1/3

RESILIENCY

Well 8

Client: Great Neck Water Authority

Location: Great Neck, NY

Completion Year: 2021

The pump room at Well 8 is below grade and vulnerable to flooding and is required to be raised to provide reliable source of potable water.  Macan Deve was contracted by CDM Smith to provide architectural design and construction phase services for a new well treatment building at WAGNN Well No. 8.  The new building will include the raised pump room as well as a multilevel area for the AOP system that will include the UV system, peroxide chemical storage and pumping system and GAC system.  

Services: 

  • Architectural Design

  • Understanding of flood adaptation strategies

  • Understanding of unique challenges needed to perform work with minimal disruption to daily operations 

  • DOB Permitting Support 

  • Permitting Support 

  • DSDC

  • Shop Drawing Reviews

  • RFI/RFC Response & Processing 